生物脫硫設備冷卻塔的安裝

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應根據(jù)設備的各種條件,考慮其安裝位置的地面及其荷載能力,同時也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時應注意冷卻塔的基礎(chǔ)按規(guī)定的尺寸預埋好水平鋼板,各基礎(chǔ)點的標高應在同一標高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應放置水平。水塔在施工安裝時,為防止壓壞底盤,施工人員應踏在底盤的加強筋上,在安裝塔外殼、底盤等纖維件時,為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認底盤不變形,附近干凈、干燥的條件下,為避免使用時漏水可在接觸處鋪設纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風不良和出現(xiàn)濕空氣回流的場合,須安裝在通風良好的場所。否則將會降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送冷卻塔,經(jīng)冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時,應根據(jù)施工圖指明的坐標位置就位,并應找平找正,設備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.
以上就是為大家介紹的有關(guān)生物脫硫的詳細的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務http://www.fengkecheng.cn
The above is a detailed introduction of biological desulfurization for you. I hope it will be helpful to you. If you have any questions, please contact us. We will provide you with professional services http://www.fengkecheng.cn

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務于沼氣等可燃氣體凈化及利用行業(yè)
亚洲一区二区三区久久| 最近的中文字幕在线看视频| 亚洲精品国产精品乱码不卡√香蕉| 亚洲a∨无码无在线观看| 亚洲国产AV美女网站| 波多野结衣高潮喷水在线观看| 亚洲AV一二三区成人影片| 国产IGAO视频网在线观看| 久久aⅴ免费观看| 人妻互换精品一区二区| seseav| 2019年中文字字幕在线看不卡| 免费无码又爽又刺激高潮视频| 久久久久精品国产亚洲av电影| 久久久免费看| 欧美午夜福利| 成人午夜亚洲精品无码网站| 天天爽夜夜爽人人爽| 成人片无码免费视频在线播| 通山县| brazzers欧美丝袜秘书| 69精品| 国产亚洲观看无码等最新內容 | 国产在线天堂| 好大好硬好爽免费视频| 亚洲av日韩综合一区二区三区| 少妇粉嫩小泬喷水视频在线观看| 亚洲综合激情五月丁香六月| 久久丁香综合五月国产三级网站| 午夜福利亚洲| 精品一区二区ww| 亚洲精品思思久久电影网站| 亚洲VA韩国VA欧美VA| 亚洲成AV人无码综合在线 | 97人人模人人爽人人少妇| 亚洲AV激情无码专区在线下载| av超碰| 成人色在线| 少妇白浆| 综合开心四月份激动的心情| 久久青青草原精品国产|